Egyptian: views along the east side / Las Palmas Ave.

6712 Hollywood Blvd. Los Angeles, CA 90028 | map |

The Egyptian Theatre pages: an overview | Hollywood Blvd. views 1922-1954 | Hollywood Blvd. 1955-present | forecourt | lobby - earlier views | lobby - recent views | auditorium - earlier views | auditorium - recent views | booth | backstage | Egyptian 2 & 3 | along Las Palmas Ave. | along McCadden Place



1994 - Damage to the rear of the building from the Northridge earthquake. This is one of over 800 images in the great book "The Story of Hollywood: An Illustrated History" by Gregory Paul Williams, available on Amazon. This photo is on page 352. There's a preview of the book to browse on Google Books.  It's a shot that also makes an appearance in "Temple of Film: 100 Years of the Egyptian Theatre," an eleven minute short Angus Wall made for Netflix to celebrate the theatre's reopening in 2023.
 
 
 
c.1997 - Repair work underway on the stagehouse and auditorium walls. The building on the right had once been the Egyptian II and III. It's a photo that appeared, uncredited, with the presentation Netflix made about their renovation plans to the city's Cultural Heritage Commission on January 7, 2021. The visuals from that presentation are available in a 1/7/21 Google Drive folder



 
2013 - The white building, formerly the Egyptian 2 & 3, was the Arena Cinema at the time of the photo. Behind it is the theatre with an interesting view of the back of the forecourt wall. We're looking west across Las Palmas Ave. Photo: Bill Counter
 


2019 - The east wall. The upstage door (just to the right of the neighbor's scaffolding) went behind the screen and to what little was left of the basement. The organ chambers are on the roof just in front of the proscenium wall. Note a little access door, blocked at the time, to get into the house left one. Photo: Bill Counter



2019 - Looking along the east wall toward the forecourt. At the far left is an exit from the front of the auditorium. The stairs in the center go to the house left singer's box. Photo: Bill Counter


 
2021 - The demolition work in full swing for the Netflix renovation project. Exterior stucco was getting removed for better waterproofing of the interior plaster walls and installation of a new seismic bracing system. See the backstage page for interior views of the stage during the renovations. Photo: Bill Counter - October 11
 
 
 
2021 - A peek inside at a temporary steel structure holding up the proscenium wall, the organ chamber and the front of the decorative ceiling. Photo: Bill Counter - October 11
 
 

2021 - A better view view straight through after the removal of additional sections on the opposite side. Photo: Bill Counter - November 23 
 
 

2022 - The stripped out area of the house left singer's box. Photo: Bill Counter - January 6
 
 

2022 - Looking along the east wall toward the forecourt. That opening with the orange mesh is an office area, formerly the men's smoking room, that's above the boxoffice space. Photo: Bill Counter - January 6
 
 

2022 - Thanks to Tyler Purcell for this photo, a January post on the Friends of 70mm Facebook page.
 
 

2022 - Getting a bit more treacherous to walk out to the forecourt. Photo: Bill Counter - February 7
 
 

2022 - Looking along the east wall after more digging adjacent to the building. That's the back of the singer's box in the upper left. Bill Counter - May 12
 
 

2022 - Farther toward the forecourt. The red marks on the concrete indicate where repairs and patching are needed. Bill Counter - May 12
 
 

2022 - A view back toward the stage end of the building. Bill Counter - May 12  
 
 

2022 - A peek in the front exit house left. Bill Counter - May 12. See the auditorium page for many photos of the interior during construction. 
 
 

2022 - The east wall as construction continues. Once upon a time the building on the right was the Egyptian II and III. Bill Counter - May 12 
 


2022 - A view a month later without the blue tarp. Repairs on the concrete columns are winding up and the voids will soon get filled in. Photo: Bill Counter - June 21
 
 

2022 - A closer look at the stagehouse. The man up there on the beam with the rotohammer is drilling holes for insertion of pieces of horizontal rebar before concrete is poured to fill in the walls. Photo: Bill Counter - June 21 
 
 

2022 - The stagehouse and auditorium getting sealed up again with new concrete in many of the bays. Photo: Bill Counter - July 20 
 
 

2022 - Scaffolding going up to do some infill at the top and stucco the stagehouse. Photo: Bill Counter - August 19
 
 

2022 - A look up to the former smoking lounge above the boxoffice area. Photo: Bill Counter - August 19
 
 

2022 - The vista back toward the stage end of the building. The opening on the far right goes into the lobby. Photo: Bill Counter - August 19
 
 

2022 - An auditorium side wall plaster detail. Photo: Bill Counter - August 19 
 
 

2022 - The back of the house left singer's box. That's new concrete in the areas covered with the black membranes. Photo: Bill Counter - August 19 
 
 

2022 - A stagehouse view as scaffolding goes up. Photo: Bill Counter - August 19 
 
 
 
2022 - The exterior walls continued to get filled in. Photo: Bill Counter - September 16 
 
 

2022 - A look toward the stagehouse from up the block on Las Palmas. Photo: Bill Counter - October 14 
 


2022 - A cutaway view of the rooftop organ chambers in front of the proscenium wall. The sloped area on the right is the tone shoot that directed the sound down to the auditorium via the ceiling sunburst grille. Photo: Bill Counter - October 14 
 
 

2022 - The open top of the wall is the rear of the deconstructed parapet above the theatre entrance. The guess is that Sid had a walkway built along the back of the wall for his Bedouin to patrol the rooftop. The angle seen on the side of the structure follows the line of the tile roof seen from the street. Photo: Bill Counter - October 14 
 
 

2022 - In the exit passage along the east side of the building looking toward Hollywood Blvd. Photo: Bill Counter - October 14 
 
 

2022 - Looking back toward the stagehouse with a fine view of some of the new steel going into the east wall. Photo: Bill Counter - October 14  
 
 

2022 - The exit to the forecourt. Photo: Bill Counter - October 14
 
 

2022 - While most of the passage along the east side of the building had been filled in, the excavation continued on the lobby end of the building. Photo: Bill Counter - November 22
 
 

2022 - A look into the hole on this side of the exit to the forecourt. Photo: Bill Counter - November 22
 
 

2022 - More areas on the east wall continued to be filled in. Photo: Bill Counter - November 22  
 
 

2023 - Work continues on the east wall. Photo: Bill Counter - January 20 



2023 - A look north along the wall. Photo: Bill Counter - February 21
 
 

2023 - The exit to the forecourt. Photo: Bill Counter - February 21
 
 

2023 - New stucco along the auditorium wall. Photo: Bill Counter - May 22 
 

 
2023 - Getting golden again. Photo: Bill Counter - June 9
 


2023 - New concrete along this side of the building. Photo: Bill Counter - July 26
 
 
Hollywood Theatres: overview and alphabetical lists | Hollywood Theatres: list by address | Downtown theatres | Westside | Westwood and Brentwood | Along the Coast | [more] Los Angeles movie palaces | L.A. Theatres: main alphabetical listL.A. Theatres: list by address | theatre history resources | film and theatre tech resources | theatres in movies | LA Theatres on facebook | contact info | welcome and site navigation guide

No comments: